01 / Understand
Define use, audience, site and investment priorities before choosing a visual direction.
SERVICES / TOKYO
Interior architecture starts with the organisation of space. We examine proportions, thresholds, circulation and the relationship between the existing structure and new interventions. The aim is a clear spatial framework that can hold the interior concept, services and daily use together.

For an existing Tokyo property, survey information and building constraints influence what can responsibly be proposed. We develop options before committing to a single plan and coordinate the chosen direction with the appropriate building and specialist teams. Where a project needs architectural or engineering approvals, the required professional responsibilities are identified in the appointment.
Before work starts, we agree the deliverables, review stages and responsibilities. Share the available plans, area, preferred timing and operating priorities. Where information is incomplete, the proposal should identify the checks needed rather than conceal assumptions inside an attractive image.
Define use, audience, site and investment priorities before choosing a visual direction.
Compare layouts and material ideas against the brief; make the important decisions visible.
Connect the interior package with specialists, building review, procurement and programme.
Review execution, resolve outstanding items and prepare for the agreed handover.
The sequence is adapted to the appointment and the building. Cost, procurement and design reviews are linked so that approvals happen with useful information. We identify specialist interfaces early and record changes before implementation.
FAQ
Existing-space review and options, Circulation and spatial hierarchy, Interior details and technical coordination, Consultant interfaces and documentation. The appointment confirms the exact deliverables, exclusions and specialist responsibilities.
We assess the area, existing information, complexity, required drawings and delivery involvement. A project-specific proposal separates design work from construction and procurement assumptions, so the basis of comparison is clear.
Yes, the starting point is a responsibility review and access to the available drawings and building information. We identify interfaces and missing information before finalising the programme or technical package.
We clarify the brief, discuss suitability and identify the information needed for a proposal. Once scope and appointment are agreed, the work progresses through concept, coordination and the agreed implementation stages.